COST AND FEASIBILITY OF REPOWERING WIND FARMS IN KANIYAKUMARI DISTRICT OF MUPPANDAL AREA OF TAMIL NADU

Authors

  • Dr. P.S.J SUDAN

Keywords:

.

Abstract

The aim of this paper is to determine the main cost and feasibility of repowering windfarms. The Muppandal area wind farms have first generation WTGs which have completed an age of 15 – 20 years. In Muppandal wind farm efficiency of production

References

➢ Anand John, Anjali Nair, Antony, ‘Economic feasibility analysis of repowering a wind farm in south India’, International Journal of Scientific Engineering and Research’, vol. 5, no. 7, pp. 93-95.

Downloads

Published

2024-12-21

How to Cite

Dr. P.S.J SUDAN. (2024). COST AND FEASIBILITY OF REPOWERING WIND FARMS IN KANIYAKUMARI DISTRICT OF MUPPANDAL AREA OF TAMIL NADU. Journal of Computational Analysis and Applications (JoCAAA), 33(08), 7684–7698. Retrieved from https://eudoxuspress.com/index.php/pub/article/view/5820

Issue

Section

Articles