Identification Major Factors Contributing to Delays on Construction Sites using SPSS

Authors

  • Deekshith Jain Assistant Professor, Department of Civil Engineering, R N S Institute of Technology, Bengaluru
  • Sumant Nivarutti Shinde Assistant Professor, Department of Civil Engineering, Dr. Vishwanath Karad MIT World Peace University, Kothrud, Pune
  • Arun Raja Lourdu Assistant Professor, Department of Civil Engineering, P.S.R. Engineering College, Sivakasi, Tamil Nadu, India
  • Girish Joshi Assistant Professor, Department of Civil Engineering, G H Raisoni College of Engineering and Management Pune
  • E.Prabakaran Assistant Professor, Department of Civil Engineering, Dr.N.G.P. Institute of Technology, Kalapatti, Coimbatore
  • Manoj S. Pillai Assistant Professor, Department of Civil Engineering, Saraswati College of Engineering, Kharghar, Navi Mumbai

Keywords:

Delay, Construction, SPSS, Factor Analysis.

Abstract

Delays in construction projects are a serious difficulty, typically resulting in price overruns, contract conflicts, and worse project quality. This research aims to identify the primary variables leading to construction site delays using the Statistical Package for the Social Sciences (SPSS) for data analysis. The collected data from construction industry specialists using structured questionnaires was then examined for issues like poor project planning, resource limitations, design modifications, and external effects like weather. The investigation aimed to measure the impact of each factor on project schedules, providing a comprehensive understanding of the reasons for delays. Analysed the data using SPSS, applying descriptive and inferential statistical approaches to pinpoint significant delay variables and their significance. The findings revealed that inadequate project management, a lack of competent personnel, and material procurement challenges were among the leading causes of construction delays. The results of this research provide significant information for contractors, project managers, and stakeholders, allowing them to apply proactive delay mitigation techniques. Addressing these essential aspects allows construction projects to have more predictable timeframes and cost-effective results.

Downloads

Published

2024-09-26

How to Cite

Deekshith Jain, Sumant Nivarutti Shinde, Arun Raja Lourdu, Girish Joshi, E.Prabakaran, & Manoj S. Pillai. (2024). Identification Major Factors Contributing to Delays on Construction Sites using SPSS. Journal of Computational Analysis and Applications (JoCAAA), 33(07), 429–437. Retrieved from http://eudoxuspress.com/index.php/pub/article/view/1068

Issue

Section

Articles

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)